HOLDER OF 15 PATENTS & COPYRIGHTS | |
25 YEARS OF MANAGERIAL EXPERIENCE |
320% INCREASE IN SALES AND PRODUCTION IN 4 YEARS |
17% REDUCTION IN COSTS WITHIN 3 MONTHS |
COMPLETE TURNAROUND WITHIN 1 YEAR |
RESCUED HUNDREDS OF COMPANIES |
WHO’S WHO WORLDWIDE BUSINESS LEADERS |
Business Evolutions , inc. inc. will provide the solutions to business problems for our clients through Consulting and/or Continuing Management Services. By accessing technical expertise and advanced technologies that normally only large corporations can afford, we will provide efficient and cost effective solutions to our clients. We will utilize our clients' resources and develop their potentials to the best that they want to be.
|
High Level Executives |
Sales/Marketing, Operations, Admin. |
8 to 45 Years of Managerial Experience |
Average: 18 years of experience |
Utilizing your natural resources |
Quick, efficient, effective solutions |
Dyna-Flex Budget Control Systems © |
Dyna-Flex Resource Management © |
48-point Business Check-up © |
49 Ways to Evaluate a Business © |
50 Steps to Being Your Own Boss © |
54 Layoff Alternatives © |
B-911 Emergency Business Plan © |
B-Complex Comprehensive Business Plan © |
Business Development Authority © and |
Dynamic Global Equilibrium Theory © |
Add Personality & Design During Production © |
Add Personality & Design After Production © |
SuperCooler © |
Electric Force Field © |
Emergency Signal © |
A Customized Control Net System cast over the ocean:
- Dynamic and flexible |
- “Floats” (sensors), which are strategically located throughout the net. They sense, predict, adjust, and shift resources. |
- Customized based on the condition of the water (internal variables) and the wind (external variable - the environments), the weights, size and the pattern of the net (and the floats) will vary. |
- Maximize efficiency and effectiveness, without giving up control. |
|
Components of Dyna-Flex ©
|
DYNA-FLEX RESOURCE MANAGEMENT ©: Manages and allocates resources to deliver the right goods and
services to the right location at the right time, right quantity, right quality and right price.
This enhances efficiency and effectiveness.
|
DYNA-FLEX CONTROL SYSTEM ©: Can be superimposed over any budget system. It controls internally
and externally to ensure budget compliance while enhancing efficiency and effectiveness.
|
CONTINGENCY PLANS: Such as B-911 © , 54 Layoff Alternatives ©, 48-point Business Tune-up ©, or
similar plans to ensure budget compliance
|
Before Dyna-Flex © - Always exceeded Budget
|
After Dyna-Flex © - Always under Budget
|
Dyna-Flex vs. Ordinary System Actual Case
|
REALISTIC: Dyna-Flex © uses past and present information (internal and external) to predict
the future, with consideration for Sales, Marketing, Operation, Financial, and Administrative
issues within and around the organization.
|
DYNAMIC CONTROL: Other budgeting systems are “set one time and forget about it.” Dyna-Flex © sets
the Master Budget, then continuously monitors and shifts resources to where it’s needed the most.
|
PROACTIVE: Other budgeting systems analyze the results “AFTER the fact.” Dyna-Flex © Budget takes
the Pro-active approach. The information is always “fresh” and the control is always tight,
yet flexible.
|
DE-CENTRALIZED: Other budgeting systems are too rigid and too late. Dyna-Flex © shares the control
at the point of expenditures . . . BEFORE it’s spent.
|
INTERACTIVE: Other budgeting systems can only be understood by the Financial department.
Dyna-Flex © encourages teamwork. Other departments must know exactly what’s expected of them
and how they can meet corporate as well as departmental goals and objectives.
|
How Dyna-Flex © Works
(What happens when sales drops 13%?)
|
(Actual Results) |
Original |
No Planning |
Layoffs |
Dyna-Flex | |
SALES |
32,858,565 |
28,689,982 |
28,689,982 |
28,689,982 | |
PAYROLL |
16,640,822 |
16,640,822 |
15,604,003 |
13,915,663 | |
COSTS OF GOODS SOLD |
8,583,562 |
8,583,562 |
8,314,708 |
7,970,876 | |
SUPPLIES |
2,186,049 |
2,186,049 |
3,744,990 |
2,110,653 | |
NON-CONTROLLABLES |
2,460,991 |
2,460,991 |
2,460,991 |
2,460,991 | |
TOTAL EXPENSES |
29,871,423 |
29,871,423 |
30,124,692 |
26,458,182 | |
NET INCOME |
2,987,142 |
(1,181,441) |
(1,434,710) |
2,231,800 | |
===========================================================
With layoffs, there was a reduction in payroll, but productivity and morale went down, resulting in an even greater loss.
|
With Dyna-Flex © and B-911 ©, we retained most of the original net income.
|
Before Dyna-Flex © - Always exceeded Budget
|
After Dyna-Flex © - Always under Budget
|
Dyna-Flex vs. Ordinary System Actual Case
|
B-911 EMERGENCY BUSINESS PLAN ©
|
B-911 © is a 4-step program that utilizes American, European and Asian styles of management to analyze
and strengthen a company inside out, from all angles (sales, marketing, operations, and administrations)
for immediate improvement.
|
B-911 © combines several strategies that have been proven over the years, but when applied individually,
each has its own limitations and negative impacts. B-911 © dovetails these strategies together, with
a few new twists, to minimize, if not eliminate such problems.
|
All the steps may not be used, some steps may be implemented concurrently, and the sequence may change,
depending on the company’s needs. Some, but not all examples are listed below.
|
Correct combination, placement, and timing will strengthen the company. Incorrect combination, location,
or timing may hurt it.
|
B-911’s phase I (The QuikFix) can be applied within a week, with savings equivalent to 10-15%
of payrolls.
|
It delivers optimum results with minimum side effects to revive the company immediately, helping
it cope with sudden economic and operational difficulties.
|
Layoffs give you permanent damage with a temporary cure. B-911 ©, on the other hand, provides
you the medics to give you temporary treatment, giving you time to find the doctors
to determine the type, potency, and location of the poison(s), then apply a permanent cure.
|
Dyna-Flex Management Systems © Real Solutions, Real Results
|
|
|
|